Mission Planning and System Architecture

Focus question: How should teams organize interfaces, dependencies, roles, and test gates before integration begins?

Mission Briefing

Today’s Plan

A focused sequence that advances the rover and VEX ground-support mission.

Opening promptConcept modelGuided practiceInteractive applicationEvidence checkExit ticket
Lesson Targets

What You Will Be Able to Do

Learning Target

I can create a system architecture and integration plan that exposes dependencies before building.

Evidence

Mission architecture and integration plan

Success Looks Like

The plan identifies interfaces, build order, owners, and verification gates.

Activity Flow

How the Lesson Moves

Each step builds the control-systems reasoning needed for today’s deliverable.

1. Decompose the system

Break the mission into rover, support, software, power, and interface subsystems.

2. Map interfaces

Define what crosses each boundary: motion, power, signal, or physical connection.

3. Schedule integration

Order work so each subsystem is verified before full mission testing.

Lesson Interactive

Mission architecture and integration plan Practice

Apply the lesson concept to an aerospace rover or VEX ground-support scenario. Use the feedback to correct reasoning before documenting the main deliverable.

Integration Principle

Each major subsystem should be defined and verified before the complete mission is attempted.

Requirements
Subsystems
Interfaces
Integration

Order the Planning Work

  1. Integrate rover and ground-support system
  2. Confirm measurable mission requirements
  3. Decompose mission into subsystems
  4. Define physical, electrical, and data interfaces
  5. Verify each subsystem independently
  6. Run controlled integrated mission tests
Plan from requirements to subsystems and interfaces, verify pieces, then integrate and test the complete mission.
Today’s Work

Main Deliverable

System Architecture and Integration Plan

Create one focused engineering artifact that demonstrates today’s learning.

  • Create a subsystem diagram with all physical, electrical, and information interfaces labeled.
  • Assign owners and define at least three integration gates with entry criteria.
Exit Ticket

Mission Debrief

1

State one control-systems or automation idea from today in your own words.

2

Name one measurement, calculation, trace, or test result that supports your design decision.

3

Identify one interface, logic, safety, or reliability risk to carry into the next lesson.

Resources

Lesson Resources

Presentation

Lesson 3.15 PowerPoint

Use the presentation to review the lesson concepts, examples, and activity directions.

Course Hub

Principles of Engineering

Return to the POE course hub for units, resources, certifications, and course information.

Unit Challenge

Rover Mission + VEX Ground Support System

Use the integrated mission context when connecting logic, sensing, actuation, testing, and design-review evidence.