Learning Targets
- Fabricate components using the approved design and safe procedures.
- Check fit with the provided rocket throughout the build.
- Document changes from the approved plan and explain why they were necessary.
Focus Question: How do engineers turn a plan into a prototype while documenting changes?
Every task advances the same Rocket Launch Pad Design Challenge.
The prototype is complete, the rocket can be installed and removed, and the build record explains any important deviations from the final drawing.
Fabrication is part of the engineering process. If reality forces a change, document it.
| Original Plan | What Changed? | Why? | Evidence / Observation |
|---|---|---|---|
| Describe the planned feature. | Describe the change. | Explain the reason. | Fit issue, material behavior, measurement, etc. |
Engineering rule: A change made during fabrication is still a design decision. Record it.
Submit the complete team evidence required by this lesson. Use clear labels, dimensions, test data, and reasoning where applicable.