Unit 1 Final Project: VEX Cargo Lift Engineering Challenge

Challenge: Design and build a VEX cargo lift that raises a 500 g payload at least 400 mm vertically and completes three consecutive successful trials.

Start Here

What You Need to Do

Use this as your checklist throughout the challenge.

Work On

  • Detailed concept sketches or a CAD model with a labeled mechanism plan
  • Freestanding VEX cargo lift
  • Guided payload platform
  • Motor-powered lifting system
  • Three official test trials
  • At least one engineering revision
  • Work and power calculations

Submit

  • Initial detailed concept sketches or CAD model
  • Mechanical-system / gear-ratio explanation
  • Three-trial test data
  • Average lift time
  • Work calculation
  • Power calculation
  • Problem observed + design revision
  • Final reflection

Done When

Your lift raises the 500 g payload at least 400 mm, remains freestanding, keeps the payload guided, and completes three successful trials in a row.

Requirements

Your Lift Must Include

Structural Frame

A freestanding VEX structure that supports the lift and remains upright without being held.

Payload Platform

The payload must sit on a platform, tray, or carrier. It may not simply hang from the string.

Guided Vertical Motion

Use rails, channels, rollers, wheels, sliding guides, or another approved method so the platform moves primarily up and down.

Motor-Powered Lift

A VEX motor must provide the lifting power. No manual assistance is allowed during an official trial.

Power Transfer

Use a winch/drum, gears, chain and sprockets, pulleys, or an appropriate combination.

Stable Base

The lift must support itself throughout operation. Students may not stabilize it by hand.

Performance Standard

What Counts as Success?

RequirementStandard
Payload mass500 g
Vertical lift distance400 mm minimum
Successful trials3 consecutive trials
Power sourceVEX motor
Student assistanceNone during official trial
Payload retentionPayload remains on platform
StructureFreestanding and functional
Design Freedom

What Your Team Gets to Decide

Structure

  • Overall geometry
  • Frame width and height
  • Structural bracing
  • Base design

Lift System

  • Platform design
  • Guide system
  • Winch/drum design
  • Cable/string routing

Power & Motion

  • Motor location
  • Gear ratio
  • Gears, chain, sprockets, or pulleys
  • Speed-versus-torque strategy
Rules

What You May Not Do

  • Hold or stabilize the lift during an official trial.
  • Touch the payload or platform while it is moving.
  • Manually assist the motor, axle, drum, or lifting string.
  • Change the standardized payload mass.
  • Begin with the payload partially raised.
  • Allow the payload to hang freely instead of using a guided platform.
  • Use non-VEX structural components unless specifically approved.

If the lift jams, tips, drops the payload, or requires assistance, the trial is unsuccessful.

Before You Build

Document Your Design

Before building, document your proposed lift using detailed concept sketches or a CAD model. A CAD model may be substituted for the detailed concept sketches as long as it clearly communicates the complete design. Your sketches or CAD model must clearly show and label:

  • overall lift structure
  • payload platform
  • vertical guide system
  • motor location
  • power-transfer system
  • winch/drum or lifting mechanism
  • planned gear ratio
  • major structural bracing

Before building, your team should be able to explain how power travels from the motor to the payload.

Engineering Concepts

What You Should Be Thinking About

Gear Ratio

How will your ratio change output speed and torque?

Mechanical Advantage

Does your mechanism increase the force available to raise the payload?

Work

W = Fd

Use the payload force and vertical lift distance.

Power

P = W/t

Use the work performed and lift time.

Friction & Alignment

Look for rubbing, binding, uneven winding, or platform tilt.

Structure & Load Path

Follow how the payload force travels through the cable, frame, bracing, and base.

Official Testing

Three Consecutive Trials

Start each trial with the platform at the LOW position and the complete 500 g payload resting on it. Remove your hands before the test begins. Timing starts when the motor begins moving and stops when the payload reaches the required height.

TrialPayloadLift HeightLift TimeSuccess?
1500 g_____ mm_____ sYes / No
2500 g_____ mm_____ sYes / No
3500 g_____ mm_____ sYes / No
Iteration

Required Design Revision

Your first working design is not automatically your final design. Identify at least one problem, make a meaningful engineering revision, and document the change.

Possible issues include platform tilt, motor stalling, slow lifting, frame flex, gear skipping, uneven string winding, binding, base instability, excessive friction, or unnecessary mass.

Submission

What You Will Submit

  1. Initial detailed concept sketches or CAD model
  2. Completed VEX cargo lift
  3. Gear ratio and/or mechanical-system explanation
  4. Three-trial testing data
  5. Average lift time
  6. Work calculation
  7. Power calculation
  8. One problem observed during testing
  9. One documented design revision
  10. Final reflection: Explain the most important tradeoff your team made between speed, torque, stability, and reliability.